Needs Assessment
About the exercise
- Schedule
- Topic of each session, duration
- People from the client team needed for different parts
- People from Bahmni team participating
- Dates
- Communication Channel (if done remotely)
- Tools
- Materials shared before the exercise
- Schedule
- Prior understanding
- Questionnaire
Current Situation
- Client's organisation profile and structure
- Services provided by the client and the health facilities from which these services are provided
- Types of service (out-patient, in-patient, surgery, lab, community care etc.)
- Number and types of providers, patients (per day/week)
- Nature of the facility (always open, few days a week, on need basis)
- Current information systems in place
- Technical details of the system
- Departments in which it is used
- Issues with current system
- Ability to Export data in .CSV or .XLS format
- Infrastructure
- LAN
- Power backup for servers
- Internet connectivity
Requirements
- Primary objective of the system
- Drivers (e.g. data entry, point of care use, reporting, patient care outcome improvements)
- As is process understanding
Department (Service/Location) based breakup of requirements
- Functions that need to be supported
- Type of users and workload details
- Internet connectivity at these locations (if it is outside the hospital)
- Any paper forms and files used in as-is process
- List of current reports (Electronic and Paper based). Reports needed by each department. Reports sent to the government.
- Printouts required in each department
- Organisational requirements
Reports sent to government
- Typical requirements that may get missed
- How a patient is identified
- PACS integration
- Detailed understanding of the processes that would be supported by "modules not implemented anywhere in Bahmni"
- Do they perform any surveys? Is it expected that Bahmni would be a solution for that too?
- Is money taken only at billing? Or it is at multiple places?
- Data migration requirements (import existing data)
- Would the required reference data and meta-data be provided by the client, or is available in the old system, or would have to be created from scratch?
- High level milestones or releases in which new system could be rolled out
- Artefacts to get
- image of paper forms
- sample of database extract
Solution
- Mapping requirements to Bahmni's features
- Infrastructure assessment
- Deciding server configuration
- Projection of number of client devices required
- Identification of gaps (between requirements and Bahmni features). Things that need to be developed in product.
Engagement
- IT/Data people availability who have to administer or implement Bahmni. Familiarity with the following:
- Network
- Linux, Windows
- Excel (macros?)
- SQL
- Engagement model (TW, Implementer and Client)
End Deliverables Expected
- Software (modules in Bahmni)
- Implementation of Bahmni
- Individual items that would be configured from this checklist.
- Integration with other systems
- Bahmni deployment
- Data migration from existing systems
- Training to people
- System administrator
- End user
- Local implementation team
Tips
- If something seems unrealistic then ask question about whether it is aspirational?
- When deciding the release size, the trade-off is between travel costs and size of release (also organisation change as a result)
- Keep updating your plan as needed, this is just a guide
- To find out about the skill levels, just asking directly is the best way.
- Try ice-breakers if you feel awkward starting off. Introductions generally are enough though
- Figure out when to give a demo during this exercise
(If you find that there are things missing in this list then please add to it)